Skip to content
October 21, 2009 / knapper08

We have a (concrete) floor

To prepare the floor for concrete, we laid a plastic vapor barrier against the ground, added a layer of  rigid foam insulation, and topped that with wire mesh. Then, for the radiant floor tubes, we attached long loops of PEX tubing throughout the floor in pre-planned zones to the wire mesh.

The concrete trucks arrived at 7am this morning, and the floor is poured…now it’s a waiting game for it to dry (we need sun and NO rain!!!) so it can be finished!

Laying the radiant floor tubes

And the race is on!

Adding the finishing touches!

Leave a comment